Trial Assembly Parts Made So Far

Trial Assembly of the Boilers, Sideplates and Smokebox

Published 20 May 2025

Having put the boiler in the boiler casing I mounted that assembly into the engine sideplates –  comprising hornplates and tender plus smokebox. This was to test fit and dimensions – the 1905 general arrangement drawings being a bit lacking in overall layout dimensions.

Image showing Bassett Lowke Traction Engine Boiler in Casing with Sideplates Side View

Bassett Lowke Traction Engine Boiler in Casing with Sideplates Side View

Now some close-ups showing critical dimensions.

Image showing Bassett Lowke Traction Engine Boiler in Casing with Sideplates Dimensions

Bassett Lowke Traction Engine Boiler in Casing with Sideplates Dimensions

Front Plate to front of Casing 5″, Front Plate to Backhead 2 3/4″. 

Image showing Bassett Lowke Traction Engine Boiler in Casing with Sideplates Backplate Dimensions

Bassett Lowke Traction Engine Boiler in Casing with Sideplates Backplate Dimensions

Bottom of Backhead to underside of Hornplates ~ 1/4″. Import to define the space available for the burner.

Leave a Reply

Your email address will not be published. Required fields are marked *